Abstract

The High-Intensity Proton Accelerator Project, named J-PARC, is in progress, with the aim of enabling studies on the latest basic science and the advancement of nuclear technology. In the project, a high-energy proton accelerator complex with the world's highest instantaneous intensity is under construction. In order to establish a reasonable shielding design, both simplified and detailed design methods were used in the shielding design of J-PARC. This paper reviews the present status of the radiation safety design study for J-PARC.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.