Abstract
The PhaseII Upgrades of CMS are being planned for the High Luminosity LHC (HL-LHC) era when the mean number of interactions per beam crossing ("in-time pileup") is expected to reach ~140-200. The potential backgrounds arising from mis-associated jets and photon showers, for example, during event reconstruction could be reduced if physics objects are tagged with an "event time". This tag is fully complementary to the "event vertex" which is already commonly used to reduce mis-reconstruction. Since the tracking vertex resolution is typically ~10^{-3} (50 micron/4.8cm) of the rms vertex distribution, whereas only ~10^{-1} (i.e. 20 vs.170 picoseconds (psec)) is demonstrated for timing, it is often assumed that only photon (i.e. EM calorimeter or shower-max) timing is of interest. We show that the optimal solution will likely be a single timing layer which measures both charged particle and photon time (a pre-shower layer).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.