Abstract

We develop a method for quoting manufacturing due dates to achieve a target service level (percent of orders filled on-time). We posit a very general function for determining leadtimes as a function of work in process and use a control chart method for adjusting the parameters in this function over time. We make almost no assumptions about the nature of the underlying production system (i.e., we do not require any particular distribution of process times, nor do we require that the system be in steady state). Using simulation we show that our method is very accurate for a simple case where an exact analytic solution is possible and that it outperforms other due date quoting methods from the literature in more complex situations.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.