Abstract

In software tools such as COMcheck, use of the EnergyPlus simulation engine for performance-based code compliance raises a concern about simulation runtime which impacts the dynamic feedback of compliance results to the user. EnergyPlus annual simulations for proposed and code base line building models, and the mechanical equipment sizing runs together increase the annual simulation runtime beyond unacceptable duration, for example, to 5 minutes for a typical small commercial building. This report presents a study undertaken to compare the results of a shortened simulation time period, using 4 weeks of weather data to do a simulation of a full 52 weeks of data. Three representative building types and three climate zones were used for determining the validity of using shortened simulation run period. Further sensitivity analysis and run time comparisons were made to evaluate the robustness and run time savings of using this approach. The results of this analysis show that the shortened simulation run period provides compliance index calculations within 1% of that predicted using annual simulation results, and typically saves about 75% of simulation runtime.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.