Abstract

We analyze the queueing delay performance when random linear coding is performed over packets randomly arriving at a source node for multicast transmission over packet erasure channels. We model random coding of packets as a bulk-service queueing system, where packets are served and depart the queue in groups. In this framework, we analyze two different block-based random linear coding schemes. The first scheme involves coding over a fixed blocksize, which leads to simpler analysis but also to a delay penalty for lightly-loaded systems. The second scheme adapts to the traffic load by allowing for a variable blocksize, thereby removing the delay penalty at low loads. We provide results on the maximum stable arrival rate of packets at the source and on the queueing delay as a function of the arrival rate.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.