Abstract
The traditional quay crane of the container terminal is gradually transitioning to automation, which significantly changes the loading and unloading operation mode of the quay crane. In this paper, we study the sequence scheduling of automated quay crane (AQC) with time window constraints. First, the process of AQC handling operation is decomposed, and the mechanism model for AQC operation is established. Then, a mixed integer linear programming model is formulated to optimize the scheduling of AQC considering the time window constraints. Finally, the effectiveness of the optimization model is verified by arithmetic examples, and the management insights of energy efficiency optimization of the quay crane scheduling are given through scenario analysis.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have