Abstract
Assembly construction is extensively employed in bridge construction due to its ability to accelerate construction and improve quality. To speed the recovery of bridges after major earthquakes, this study proposes an assembled connection for precast piers and footings based on assembly construction. The precast piers are connected to the footings using ultra-high-performance concrete (UHPC) post-cast cupped sockets. Two specimens are tested with a 1:4 scale, namely, the cast-in-place (CIP) specimen and, the UHPC cupped socket pier specimen. Finite element models (FEM) of a continuous girder bridge with cupped socket connections are developed and verified by experimental results. The seismic fragility analysis is conducted to investigate the difference between the cupped socket connection and the CIP connection. The experimental results showed that the plastic hinge was formed on the precast piers and there was little damage to the UHPC sockets. The results of FEA indicate that UHPC cupped socket piers have slightly higher seismic fragility than the seismic fragility of cast-in-place piers. Then, some methods were proposed to reduce the seismic fragility of UHPC cupped socket piers, and their availability was confirmed by comparing them with the seismic fragility of CIP piers. Finally, an example bridge with this connection is introduced to illustrate replacing prefabricated piers after an earthquake.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.