Abstract
This study provides an independent, outside-in estimate of the cost and schedule risks of nuclear waste storage projects. Nuclear waste storage is here defined as special facilities for the wet and dry storage and disposal of high-level (HILW) and low and intermediate-level nuclear waste (LILW). The study analyzed cost and schedule risk profiles of past, completed nuclear waste storage (n = 22), nuclear new builds (n = 194) and underground mining projects (n = 31).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.