Abstract
The construction industry records higher accident rates than other industries, and thus, risk estimation is necessary to manage accident rates. Risk levels differ based on facility type and construction project size. In this sense, this study aims to calculate the quantitative accident risk level according to the construction project size per infrastructure facility type. To this end, the following five-step risk estimation was performed: (1) data collection and classification; (2) calculation of fatality rate based on construction cost; (3) calculation of fatal construction probability by construction cost classification; (4) reclassification of construction cost considering fatal construction probability; and (5) calculation of risk level by facility type and construction cost classification. As a result, the fatality rate per facility type was the highest in ‘Dam’ at 0.01024 (person/USD million). Additionally, the risk level according to the construction project size per facility type was the highest for ‘Dam’ (0.00403 person/USD million) for a construction of less than USD 0.77 million. The risk level presented in this study can be utilized as basic data in the design stage for safety management. Our results also indicate the necessity of preparing a separate construction cost classification for safety management.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.