Abstract

Uncertainty can be defined as a state of either incomplete or otherwise bounded knowledge. Simulation models, and the engineering systems that they represent, often contain various types of uncertainty. Different approaches and theories can be applied to model these various types of uncertainty with a range of degrees in difficulty and accuracy. The objective of this paper is to explain the various types of uncertainty found in simulation models and to examine where uncertainty can be better represented or potentially reduced. To achieve this objective, a Monte Carlo Simulation model called the As-Planned Model is developed to estimate both cost and schedule using a risk-based approach for a simplified, Light Rail Transit construction project. After the project is complete, the As-Planned model is then compared to the project’s actual results. The resulting conclusions about various types of uncertainty are derived through both output comparison as well as uncertainty analysis.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.