Abstract

In this paper, the impact of different types of leaks on the excess pumping energy required in a distribution pipe is investigated. It is now well established that leakage is directly proportional to the pressure at the leak point in a pipe such that a pressure drop is inevitable. In order to compensate this drop in pressure, the pumping energy required to supply demand at a constant pressure has to be increased. How much more energy is required depends on the type and extent of the leak. For the 3 types of simulated leaks namely: orifice, circumferential and longitudinal slits with the same area of discharge, it is found that the excess pumping energy required for a circumferential crack in the pipe is the highest, followed by the orifice and then longitudinal slit as a result of the discharge to sustain customer demand and pressure head. The results of this research can be used to design a more robust control system or pump rescheduling strategy in order to save energy and water with regard to design, operation, and rehabilitation of old water distribution system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call