Abstract

Quantifying the waste present in an operation is an important part of a number of performance improvement initiatives in the architecture engineering construction industry. Contemporary management approaches focus on waste minimization to reduce operating costs and to increase operating responsiveness and flexibility. In construction, studies have been conducted over the past 30 years as part of productivity-improvement efforts that have documented levels of wasted time in construction activities. This paper draws on the methodology of meta-analysis to provide a synthesis of the findings across all of these studies. The analysis reveals that an average of 49.6% of time in construction is devoted to wasteful activity, although this amount is widely varied. Among other things, these results demonstrate considerable potential for improvement in construction through initiatives that reduce levels of wasteful activity.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.