Abstract

In this paper, the integral groundwater investigation method is used for the quantification of PCE and TCE mass flow rates at an industrialized urban area in Linz, Austria. In this approach, pumping wells positioned along control planes perpendicular to the groundwater flow direction are operated for a time period on the order of days and sampled for contaminants. The concentration time series of the contaminants measured during operation of the pumping wells are then used to determine contaminant mass flow rates, mean concentrations and the plume shapes and positions at the control planes. The three control planes used in Linz were positioned downstream of a number of potential source zones, which are distributed over the field site. By use of the integral investigation method, it was possible to identify active contaminant sources, quantify the individual source strength in terms of mass flow rates at the control planes and estimate the contaminant plume position relative to the control planes. The source zones emitting the highest PCE and TCE mass flow rates could be determined, representing the areas where additional investigation and remediation activities will be needed. Additionally, large parts of the area investigated could be excluded from further investigation and remediation activities.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call