Abstract
Abstract In this paper we propose a model with (N + 1) different inspection rates which can be integrated with a manufacturing process described by an M/G/1 queueing system. Using illustrative examples, based on hypothetical data, the model is used to investigate the optimal inspection strategies under two, three and four inspection rate policies. For any value of N it is possible to achieve equally optimal inspection strategies by carefully selecting the associated inspection rates for different ranges of queue lengths (work in process).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have