Abstract

High smoothness and high stability are two most important characteristics in High-speed railway, which determine the significance and importance of settlement and deformation monitoring of underline engineering. The settlement observational data is complex and massive, only by reasonable and effective quality control and management, can we ensure high-speed railway’s be successfully constructed. This article sets up a strict quality control and management measures through disassembleing the procedure of settlement observational data production, to make the procedure standardized and institutionalized, and ensure the settlement observation successful implementation. Meanwhile, establish a timely quality information feedback mechanism of settlement observational data, achieve reliable and controllable settlement observation, and improve the production quality of settlement observational data to ensure high-speed railway’s construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.