Abstract
AbstractIn recent years, the introduction of photovoltaic power generation systems has been increasing from the perspective of global warming countermeasures. However, there is a problem that it becomes difficult to adjust the supply and demand balance of electric power. Therefore, in this research, the inverter by using estimation signal estimates the load of the consumer, then we aim to adjust the supply‐demand balance at the demand side. By the verification of experimental, three‐phase inverter, which is assumed to be an industrial photovoltaic power generation system, estimates the load by using pseudo random binary sequence (PRBS) signal and two proposed methods. The load estimation results show that the error rate of the estimated resistance of each phase is within a few percent by using the two proposed methods, and the load estimation is achieved.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
More From: Electrical Engineering in Japan
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.