Abstract

The efficient scheduling of the new product development (NPD) projects is important to reduce the required development time, and to offer the new product faster. Activity overlapping is commonly regarded as the most promising strategy to reduce product development times. However, overlapping must be well-planned by weighting the gain from the activity overlapping against the additional time for rework. The objective of this research was to develop a resource constrained scheduling methodology for NPD projects considering overlapping of activity couples. A particle swarm optimization based approach is used to schedule NPD projects that include overlapping process. The proposed PSO method is developed into a user friendly system so that the practitioners can utilize it. A real-life example of a product development project taken from the literature is used to show the efficiency of the software.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.