Abstract

The Borssele Nuclear Power Plant (NPP) is a Siemens/KWU 472 MWe Pressurized Water Reactor which has been in operation since 1973. In 1989, a Probabilistic Safety Assessment (PSA) program was initiated to complement deterministic safety studies and operational experience in forming a plant safety concept. In 1993, the PSA-MER model was completed and used to determine the effects a package of proposed modifications would have on plant safety and risks to the environment. This model was used to start retrospective risk profile and allowed outage times (AOTs) analyses, which both concerned the calculation of the change in total core damage frequency (TCDF) given a change in configuration. The main problems identified and reported in this paper are: (i) How to calculate the change in TCDF (ΔTCDF)? (section 3); and (ii) How to set practical decision criteria and how to use the PSA as extension to Technical Specifications (TS) AOTs? (section 4). Finally, a pilot study was conducted in order to optimize surveillance test intervals (STIs) which are also part of the TS (section 5).

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call