Abstract

Reducing the cost of construction is a primary concern for owners, designers, and builders of facilities. Today, project teams often perform constructability reviews during the design phase to identify design constraints that limit a constructor’s ability to perform construction operations effectively and increase construction cost. However, the current manual process is timeconsuming and prone to error and does not identify the cost implications of constructability problems. Consequently, many constructability problems either go undetected or unnoticed, resulting in inefficiencies in the project delivery process and increased construction cost. This paper describes a vision for on-line computer tools that provide cost-specific constructability feedback to help project teams develop more cost-effective and constructable designs. Through a case example, we outline new functionality and the corresponding formalisms and mechanisms needed to model the cost implications of different constructability problems and identify the specific design conditions that impact constructability and increase construction cost. These contributions will allow project teams to leverage IFC-based product models and enable the necessary functionality to identify constructability problems and their impact on construction costs early in the project delivery process.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.