Abstract

The ERICA's European framework that have been proposed to assess the exposure of biota to radionuclides is based on tiered approach: the Tier 1 assessment is based on equilibrium assumptions (constant radioactive releases over time, equilibrium at the interfaces water-suspended matter and water-biota); the Tier 2 assessment allows to use time-dependent and site-specific data to perform a more precise evaluation. The objective of this paper was to compare these two tiers in the context of routine releases from nuclear power plants in freshwater ecosystem. The Loire River where 14 nuclear power plants (NPPs) operate was chosen as a case study and the transport of 60Co in the river, its partition between water and suspended particles and its bioaccumulation was calculated under equilibrium and time-dependent assumptions respectively. Using this case study allowed to quantify the overpredictions linked to conservatisms assumed in Tier 1. Recommendations were identified on when a Tier 2 approach is actually needed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.