Abstract
This paper presents a prospective study on the behaviour of steel and concrete composite beams in which a linear indented continuous shear connector, called Crestbond, is used to establish the connection between the steel beam and the concrete slab and ensure the joint behaviour of these two elements. The work includes an experimental campaign developed at the Structural Laboratory of University of Minho, Portugal, and a numerical study developed with the ATENA 3D software.The experimental tests and the numerical models were developed to evaluate the behaviour of the composite beam and particularly the indented shear connector in analysis. The tested specimens consist on a steel beam with a continuous indented connector, positioned on the upper flange of the beam and continuously welded in its development, and a reinforced concrete slab, in a total span of 3000 mm. During the tests, the connector provided high stiffness and a full interaction between the concrete slab and the steel beam. The beams failure was determined by crushing on the upper part of the concrete slab.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.