Abstract
The purpose of this study was to investigate the correlation of stripping process and stuffing process of Excavator distribution at PLB ware house Kawasan Berikat Nusantara company. The problem in this research is the limitation of operational equipment, lack of maintenance service of operational equipment, and lac of number of employees. Quantitatif method with multiple linera regression technique was used in this research. There were 28 employees as sample. The result shows that the stripping process and stuffing process were significant positive relation with spareparts distribution Excavator at Kawasan Berikat Nusantara company.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.