Abstract

The purpose of this study was to investigate the correlation of stripping process and stuffing process of Excavator distribution at PLB ware house Kawasan Berikat Nusantara company. The problem in this research is the limitation of operational equipment, lack of maintenance service of operational equipment, and lac of number of employees. Quantitatif method with multiple linera regression technique was used in this research. There were 28 employees as sample. The result shows that the stripping process and stuffing process were significant positive relation with spareparts distribution Excavator at Kawasan Berikat Nusantara company.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call