Abstract

PT XYZ is one of the companies engaged in the automotive industry, especially in the motorcycle industry that produces spare parts on motorcycles. One component made by PT XYZ is Guide Comp Level K1AA. The problem in the company is one of the machines to produce the Guide Comp Level K1AA component, which is a Press machine that has a high frequency of failure. The Press machine itself consists of electrical and mechanical systems that each system consists of sequential subsystems as many as 6 subsystems and 10 subsystems. By using risk matrix, obtained two critical subsystems namely brake and trigger. Then the analysis of failure mode, effects and criticality analysis (FMECA) was carried out with output in the form of risk priority number (RPN), obtained that the selected critical subsystem is the brake. Using the reliability centered maintenance (RCM) method, then obtained the maintenance policy for the brake critical subsystem are 2 scheduled on condition task with interval time is 2.55 months and 2 scheduled restoration task with 5,394 months. The proposed maintenance policy also decreases the total maintenance cost for the critical subsystem brake up to 25% from existing maintenance costs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.