Abstract

This paper summarizes the results of a detailed study reported in Ref. [1]. A concept for a 1000 MW(e) Z-Pinch IFE power plant has ten reactor chambers. A Load, consisting of a wire array surrounding a cryogenic dynamic hohlraum target with a 3-GJ yield, must be produced, inserted into a Replaceable Transmission Lines (RTL), transported to one of the chambers, and shot every second. The conceptual design of the load facilitates automatic mass manufacturing and insertion at 1 Hz at minimum cost. A sequence of operations necessary to (1) fabricate each wire array on a holding and insertion tool, (2) manufacture, evacuate, fill with DT, freeze, layer, and assemble each target with helium gas and liquid hydrogen, (3) insert a wire array and a target under vacuum into an RTL, and (4) remove their debris, is described. Detailed cost estimates derived for the complete load production and solid debris removal cycle in a commercial-scale facility are summarized.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.