Abstract

Energy consumption as a very important factor, especially after Industrial Revolution, has had a very important role in the production. One of the vital energies in human life is Electricity that produces by distributed generation currently. This method of production is used when the national grid and transmission system have problem and it can be substitution for national grid for preparing and producing electricity. In this paper we want to study distributed generation in both project as, current and new projects which are provided basically by national grid and no-decision have been made for it. As innovation in choose, by using the analytical hierarchal process (AHP) technique both methods can be choose the best choice based on their subcategories.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.