Abstract
We consider the problem of scheduling [Formula: see text] jobs with rejection on a set of [Formula: see text] machines in a proportionate flow shop system where the job processing times are machine-independent. The goal is to find a schedule to minimize the scheduling cost of all accepted jobs plus the total penalty of all rejected jobs. Two variations of the scheduling cost are considered. The first is the maximum tardiness and the second is the total weighted completion time. For the first problem, we first show that it is [Formula: see text]-hard, then we construct a pseudo-polynomial time algorithm to solve it and an [Formula: see text] time for the case where the jobs have the same processing time. For the second problem, we first show that it is [Formula: see text]-hard, then we design [Formula: see text] time algorithms for the case where the jobs have the same weight and for the case where the jobs have the same processing time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.