Abstract

This paper is devoted to a comparison of all available branch-and-bound algorithms that can be applied to solve resource-constrained project scheduling problems with multiple execution modes for each activity. After summarizing the two exact algorithms that have been suggested in the literature, we propose an alternative exact approach based on the concepts of mode and extension alternatives to solve this problem. Subsequently, we compare it to the two procedures available in the literature. Therefore, the three algorithms as well as all available bounding criteria and dominance rules are summarized in a unified framework. In addition to a theoretical comparison of the procedures, we present the results of our computational studies in order to determine the most efficient algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.