Abstract

Many obstacles that affect the completion of the project late, like: weather, late general plan approval, late material arrival, less skills and others. The Precedence Diagram Method is the method used to create network planning especially project scheduling. This research will examine how to plan the proper project scheduling of Pressure Vessel project of PT Wika Technip which is done by PT. Barata Indonesia by using PDM.The results obtained from the cost calculation at 252 days of project life have total project cost of Rp.6.131.093.885,00 and at project age 243 days total project cost is Rp.6.236.994.056,00. In this case it is known that there is an increase in total cost of Rp.105.900.171,00 and the time difference of 9 days when the acceleration is done on the project duration from 252 days to 243 days.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.