Abstract

This study analyzes the relationship between Project Portfolio Management (PPM) and the Information Technology (IT) strategic alignment in conjunction with the intensity of technology usage. The methodological approach was a survey-based research, using structural equation modeling based on a field study involving 158 responses. The results indicate PPM has a positive relationship with IT strategic alignment and the intensity of technology usage in the organization does not affect this relationship. It is an original practical and theoretical finding that adds to the PPM studies an important perspective to be considered in the organizations and new research.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.