Abstract

Currently there are no formal decision tools or guidelines to assist owners and managers in choosing delivery systems and strategies that would allow significant reductions in the cycle time. The development of a decision aid that would allow a manager to prioritize and apply cycle reduction techniques would be a valuable tool for achieving cycle time reduction in projects. This paper presents a new high performance delivery system called project manager's game planner PMGP designed to assist a decision maker in identifying and utilizing an optimal set of radical reduction techniques RRTs with the greatest potential for success in achieving cycle time reduction. Additionally, the PMGP can assist the user in identifying the top RRTs during any of the five phases: preproject planning, design, material management, construction, and start-up. Most projects can utilize this PMGP to improve the performance whether to achieve significant cycle time reduction or to simply achieve effective execution.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.