Abstract
For many years, project management maturity models (PMMM) derived from the software industry have brought immeasurable benefits. However, the adoption and investigation of PMMM in the construction field have been weak and insufficient, particularly in construction consulting services (CCS). Moreover, professionals have gradually realized the importance of non-process factors (e.g., teamwork, culture, leadership) in the evaluation of PMMM. This study describes the construction of PMMM for CCS that considers non-process factors and combines them with CCS-specific process factors. To verify the effectiveness of the proposed model, we conduct a case study on the overall project management consultancy for China’s 2010 Winter Expo. The results would fill in the PMMM research gap in CCS and provide practitioners with ideas to improve their performance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.