Abstract


 
 
 An important growing trend is reliance on temporary organisations and mechanisms such as projects. Projects have been increasingly used in all kinds of organisations, including public sector organisations, and are widely considered as effective and precise management tools. The extent to which current evaluations are able to measure their perceived impact is, however, unclear. Are project evaluations conducted in such a way that the long-term effect of – in this case the EU fisheries policy – can be assessed, and to what extent are the contribu- tions or added value of projects as a form of organizing assessed in the evaluations? The article draws on programme theory to analyse the evaluation criteria used for European Fisheries Fund projects in Finland. The article concludes that a potential mismatch between operational logic between the evaluation system and the project logic exists. It also shows that there is a connection between decisions made to fund projects and the actions that they produce, but that a clear causal relationship measurement of project impact is difficult to establish using current evaluation criteria.
 
 

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.