Abstract

Project C-431-A includes the design of the C Water Plant outfall structure. This report documents design assumptions and the design of the spillway, outfall sewers, spillway chute, trash racks, walkways, stop log and trash rack slots, main sewer, and retention sewers. The spillway capacity is to be 268,000 gpm with a crest elevation at 429.0. This flow capacity is composed of flow from the 105-C Retention Basin (80,000 gpm), 105-B Retention Basin (45,000 gpm), and the 190-C Area main sewer (143,000 gpm).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call