Abstract
Large aperture telescopes require active control to maintain focus, collimation, and correct figure errors in the Primary Mirror (M1) due to gravity and thermal deformations. The Giant Magellan Telescope M1 active optics and thermal control systems called the M1 Subsystem (M1S) consists of the hardware and software that controls the shape, position, and thermal state of each mirror segment. A full-scale off-axis M1S prototype called the Test Cell is being fabricated and tested. The primary objective of the Test Cell is to mitigate risk by verifying that the mirror figure and position can be controlled within the image quality error budget and that the thermal control system vibration is within its system level allocation. The M1S components for the active optics support system have been fabricated, assembled, tested at the component level, and integrated into the Test Cell. The team completed the Test Readiness Review and started system level testing with the M1 Device Control Software. Lessons learned throughout the component and integrated system testing of the Test Cell will be incorporated into the M1S design for the production phase. This paper will summarize the progress of the Test Cell and results presented at the Test Readiness Review.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.