Abstract

A Muon station for sciEnce, technoLOgy and inDustrY (MELODY) has been listed in the China Spallation Neutron Source upgrade plan, and the infrastructure construction is scheduled to start by the end of 2022. The 1.6 GeV double-pulsed proton bunch will be extracted from the Rapid Cycling Synchrotron (RCS) ring to a stand-alone target station. One surface muon and one decay muon beamline are designed to provide multi-terminals for applications. In this report, we describe the design of MELODY and prospect for future applications.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.