Abstract

The 2 MW cw requirement for ITER EC transmission lines has led GA to design a number of new and modified components, namely power monitors and polarizers to meet this requirement. In addition, the ITER transmission lines may require sliding joints or bellows to accommodate the thermal expansion of the lines and/or vessel motion. The ex-vessel sections of the EC launchers require double seal waveguides, miter bends and possibly double seal sliding joints to assure tritium retention in this region. GA has developed designs for many of these components and some of them have already been tested at high power at the JAEA RF Test Stand. Thermal analyses of the standard GA power monitor miter bend show that our standard design is suitable for 1 MW cw operation when the H-field is in the plane of the miter bend. For 2 MW cw operation a modified design, which also requires H-plane orientation, has been developed and a prototype has been fabricated and is ready for testing. For long pulse/cw operation, a 2 MW calorimetric miter bend with thermally isolated mirror has been designed and a prototype has been fabricated. Since the mirror is thermally isolated, calorimetry on the mirror cooling water can provide a measure of absorbed power. Such a miter bend, when made in a double seal version, could be useful for monitoring total power at the end of an EC transmission line just before the in-vessel section of an EC launcher. A mode analyzer using an all metal water-cooled beam splitter is being developed for use in measuring in real time the HE11 and higher order mode content or total power in EC transmission lines. Such a high power diagnostic can be very useful in optimizing the alignment of the MOU output into a transmission line and in monitoring the HE11 mode purity at various locations in a transmission line. Prior to making a 63.5 mm 170 GHz version suitable for use on ITER, several prototype 31.75 mm 110 GHz versions have been fabricated and tested at DIII-D. A 170 GHz version is now being fabricated. This paper addresses the performance characteristics, design features and test results for the new and modified components being developed to assure low loss transmission and acceptable component stresses for 2 MW cw operation.

Highlights

  • A thorough description of the EC H&D transmission lines for ITER has been given in Ref. [1]

  • To meet this 2 MW cw performance we have developed a new design for the power monitor miter bend and are in the process of increasing the power capability of polarizer miter bends

  • We have developed a new component called a calorimetric miter bend that is suitable for monitoring power over long time scales based on monitoring the ohmic power dissipated in a copper miter bend mirror

Read more

Summary

Introduction

A thorough description of the EC H&D transmission lines for ITER has been given in Ref. [1]. In order to meet the ITER requirements of having each of the 24 main transmission lines and 32 additional lines to the upper launchers be capable of 2 MW cw operation, we have designed and/or modified component designs to increase their performance from the typical 1 MW cw required prior to ITER To meet this 2 MW cw performance we have developed a new design for the power monitor miter bend and are in the process of increasing the power capability of polarizer miter bends. The concept decided upon by ITER-IO is to use double Helicoflex® seals at all locations where there could be a path between vacuum and the external environment We have designed such components and are presently fabricating prototype components for ITER-IO. Progress in each of the above areas is presented in this paper

Power monitor miter bends
Calorimetric miter bend
Polarizer miter bends
ITER double seal ex-vessel launcher components
Transmission line efficiency
Conclusions
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call