Abstract

A characteristic completion versus time curve is described for the concrete formwork activity in building construction. Square feet of wooden formwork weekly production were analyzed for nine projects. The analyses resulted in similar S-shaped curves. Regression analysis produced a characteristic curve which is a model of formwork activity progress on a building project. The use of the model is considered for planning, monitoring, and controlling the progress of an activity.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.