Abstract

This paper proposes a hybrid approach using cuckoo search ahead with GWO to resolve PBUCP for a restructured power market. Under this structure, the issues in profit are improved using objective functions such as maximize profit using revenue and the total cost of the system and system constraints such as power demand constraints, reserve constraints, generator, and reserve limits and a minimum up and downtimes are determined. Here, two types of test systems such as IEEE-30 bus and IEEE-75 bus system is utilized. After the determination of the above objective functions, a hybrid method called Cuckoo- GWO algorithm is used for optimization. The simulations are done to demonstrate the performance of the proposed technique. At last, the comparison of the proposed and existing algorithms is evaluated in terms of profit and total operating cost for IEEE 30 bus system of 6-units and IEEE 75 bus system of 15-units respectively.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call