Abstract

The experience of professional structural engineers with welded steel moment frame connections following the 1994 Northbridge earthquake were gathered by personal interview. This paper captures their experiences in inspecting and repairing these connections following the earthquake. The engineers interviewed represent a wide cross section of Los Angeles structural engineering firms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.