Abstract
Reconfigurable manufacturing system (RMS) is a recent manufacturing paradigm, which can easily adjust its capacity and functionality for rapid responsiveness to sudden changes in the market. The core component of RMS is called reconfigurable machine tool (RMT), which has a modular structure. The RMTs can be reconfigured into many configurations. This ability allows RMS to manufacture many types of products with high quantities. In this paper, the scheduling of products in a multi-product line is fulfilled based on three criteria: profit over cost, due date, and reconfiguration responsiveness index. The latter is the combination of reconfiguration time and reconfiguration reliability of machines. An integrated approach of maximum deviation method (MDM) and multi-criteria decision-making (MCDM) approach called technique for order preference by similarity to ideal solution (TOPSIS) is proposed as a solution approach for getting the optimal scheduling of the products to be manufactured in RMS. Weights of criteria have been calculated using MDM and ranking of products is obtained using TOPSIS. A numerical example is presented to illustrate the scheduling of products in RMS.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.