Abstract

AbstractNatural gas usage has increased steadily over the past decades, in line with society’s demands for this resource. In turn, allied industries face the challenge of meeting construction needs for required structures, including product facilities, pipe lines, on/offshore platforms, and marine jetties. Subsequently, these structures require huge amounts of scaffolding to facilitate their construction and maintenance. As such, this research project focused on the opportunity for the civil/construction discipline to cooperate with natural gas facility construction, more specifically productivity studies on their scaffolding operations. The productivity study in this paper presents an investigation of the effect of resource configurations on on-site measures during a scaffolding operation on an actual liquefied natural gas (LNG) plant construction, which, in turn, aims for the continuous improvement of relevant worker performance. The discussion details the quantified effect of different scaffold logisti...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.