Abstract

This paper discusses the Glencoe Storm Sewer Upgrade Project in Calgary, Alberta. The proposed tunnel is 2920mm in diameter, stretching along 27th Ave SW from 15th St SW to 20th St SW with a total length of 935m. Its depth varies from 16m at the working shaft to 42m at the retrieval shaft. The tunnel will reduce surface flooding by providing temporary storage of stormwater runoff during major storm events. The focus of this paper is project planning. The planning phase includes scope definition, contract setup, cost estimate, team assembly, equipment and material procurements, risk analysis, constructability review, geotechnical investigation, Safety and ECO Plan development, and scheduling and productivity simulations. The challenges presented in this project are the unfamiliarity with the local conditions and the uncertainty of the projected productivity and completion date of the project. Those issues were modeled and mitigation strategies were established using simulation technologies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.