Abstract

Objectives: To determine the productivity coefficient, differentiate the labor productivity coefficient in the morning and afternoon, differentiate the daily labor and pieceworker productivity and differentiate the labor productivity with the Indonesian National Standard coefficient. Methods/Statistical Analysis: The method used in this study is survey and the object of this study is foreman, chief builder, artisan and coolies. Data collection is conducted by volume measurement and observation. Analyses used are difference test. Findings: The result of this study is for foundation excavation work, the excavation of sand under foundation, excavation of filling used soil and ring beam. The foreman productivity in the average of working hours is greater than Indonesian National Standard (α 5%) for the foundation excavation, the excavation of sand under foundation, excavation of filling used soil and ring beam while the daily carpenters and masons and pieceworker contract productivity are smaller than Indonesian National Standard productivity at the work of ring beam. Application: Labor productivity in the industry construction is important to be analyzed, since the success of contractor depends on the cost savings associated with the productivity. Keywords: Construction SMEs, Entrepreneurship, Innovation, Networking, Performance

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call