Abstract

The successful software project estimation is critically dependent upon measurement of productivity. The overall goal of productivity metric is to improve the ability and performance of information system evaluation as well as maintenance, moreover determine the performance of the information technology (IT) performance in business applications. The activities corresponding to productivity metrics vary at distinct management levels. The activities used within project management leads to dynamic framework that could be opted in changing or dynamic environments. At the project management level, productivities activities concentrates on effectiveness. For instance, during estimation of effort required to reproduce a system, assumption must be manufacture regarding the ability that could lead to successful development of software project and this is fetched from past projects. This paper focuses on identifying the productivity metrics that are essential and appropriate for project management process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.