Abstract

During the past several decades, the rapid expansion of service industry and the automation of manufacturing operations have gradually changed the ratio between direct and indirect labour in favour of the latter and created the need for indirect work measurement and standards. Though a few indirect work measurement and standard systems exist, much still needs to be done to refine and promote indirect work measurement and control techniques. This article develops and applies a flexible procedure for setting indirect work standards. The procedure includes six steps: establishing an accurate information system for indirect manpower planning; defining appropriate allowances; developing effective methods for measuring various types of key tasks; generating a formal engineering report after indirect work standards are established; reviewing and updating indirect labour standards and their supporting data based on analysis of historical data; and setting up a point system and/or a statistical control system whenever possible.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.