Abstract

The apparel industries must produce momentous quantities in shorter lead times. Apparel product is highly correlated with high level of productivity; sewing line should be balanced in shorter possible time and effective way for each style and quantity. The focal constraint against the higher productivity is the variation in individual capacity which is the cause of improper line balancing and bottle neck process. This paper is based on an effective layout model where to hit upon the bottleneck process through benchmark capacity and led us to use balancing process using two separate concept of manufacturing processes – modular line and traditional system both together. The research shows that this balanced layout model has increased the efficiency by 21%, and labour productivity by 22%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.