Abstract

One of the building materials that has a high business prospect is split stone. Some building material management companies in one of their departments produce split stone, which in its production there are several types of products based on size to meet various consumer demands. In production, especially in the 2021 period, there will be fluctuating or uneven production levels, where in one month there will be high production, and in another period there will be a decrease in production. Based on this, this study aims to analyze the calculation of productivity to identify what factors cause the productivity of split stone production to fluctuate. This research was assisted by using the objective matrix (OMAX) and fault tree analysis (FTA) methods. the results of the productivity recapitulation found that the attendance data component obtained an average score of 2.3 which is the lowest average when compared to other components. therefore with these results, attendance is the strongest factor affecting fluctuating productivity.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.