PT Freeport Indonesia is the largest gold and copper mine in Indonesia, located in Mimika Regency, Papua Province. In its operation, PT. Freeport Indonesia applies two mining systems, namely open pit mining and underground mining. Underground Mine at PT. Freeport Indonesia consists of DOZ, Big Gosan, DMLZ, Kucing Liar, and GBC, with one of the methods applied by PT. Freeport Indonesia is a block caving method. The Grasberg Block Cave mine has entered the production stage since September 2018, but in its operation the GBC Mine is still developing its operational area to meet production targets (development). The development cycle (cycle development), which is the main operation carried out, namely drilling and blasting, loading & transporting (mucking & hauling), primary support, and secondary support. To support the main operations, it is necessary to have main support consisting of access and area, ventilation, water and water, electricity, pull of tests, surveys, and dewatering. In the blasting process at the drawbell, one free face is needed which functions as the direction of rock collapsing in the blasting process on the drawbell. Making free face or commonly known as slot raise using a rasiebore machine from PT. Redpath for slot raise drilling. Meanwhile, in the drilling stage, the slot raise has a problem that has resulted in delays in the drilling process for the RB-50X raisebore tool. The impact of the delay in making the slot raise resulted in not achieving the production target due to a delay in the blasting process, where the blasting process in the drawbell area functions to break the rock so that it falls and can be transported to the crusher to enter the rock sizing process.

Highlights

  • Freeport Indonesia consists of Deep Ore Zone (DOZ), Big Gosan, Deep Mill Level Zone (DMLZ), Kucing Liar, and Grasberg Block Cave (GBC), with one of the methods applied by PT

  • To support the main operations, it is necessary to have main support consisting of access and area, ventilation, water and water, electricity, pull of tests, surveys, and dewatering

  • In the blasting process at the drawbell, one free face is needed which functions as the direction of rock collapsing in the blasting process on the drawbell

Read more

Summary

Introduction

In 2021, it is targeted that the main ore production will be produced from the Grasberg Block Cave (GBC) underground mine replacing the Grasberg Open Pit which will cease production. PTFI's underground mines are divided into several areas, namely Grasberg Block Caving (GBC), Deep Ore Zone (DOZ), Big Gossan, Deep Mill Level Zone (DMLZ), and Kucing Liar. The Grasberg Block Cave (GBC) underground mine is an underground mine with a total reserve of 874 million tons with gold reserves reaching 0.81 gram/ton. This makes GBC one of Freeport's underground mining blocks with large production achievements

Objectives
Methods
Results
Discussion
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.