Abstract

For a flexible manufacturing system, determining the feasible production set at a given time is essential for production management. In this paper, we propose methods for estimating the production set for a general multi–part type failure prone flexible manufacturing system. We also discuss how to get an open loop control that can ensure the system producing at the margin of its expected production set and how to estimate the corresponding variance of the expected production set. Some special flexible manufacturing systems are discussed where we also suggest some simpler approximations. Numerical examples are presented to illustrate our algorithm

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.