Abstract

The problem of production planning and setup scheduling of multiple products on a single facility is studied in this paper. The facility can only produce one product at a time. A setup is required when the production switches from one type of product to another. Both setup times and setup costs are considered. The objective is to determine the setup schedule and production rate for each product that minimize the average total costs, which include the inventory, backlog, and setup costs. Under the assumption of a constant production rate, we obtain the optimal cyclic rotation schedule for the multiple products system. Besides the decision variables studied in the classical economic lot scheduling problem (ELSP), the production rate is also a decision variable in our model. We prove that our solutions improve the results of the classical ELSP.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.